C A S E  S T U D Y

From production manager to two-time plant manager

Mike Anderson had big goals and no roadmap for the seat he wanted. Here is what fifteen years of working with Aron built.

Mike Anderson  ·  Plant Manager
Aron Kolosik
The starting point

Capable, ambitious, and carrying it alone

Mike was a production manager who wanted the plant manager seat. He was good at the work in front of him, and that was part of the problem. The habits that made him effective at one level were quietly capping the next one.

There was no playbook for the move he wanted to make. Nobody above him was developing him for it, and the pressure of the role he already held left little room to figure it out on his own.

What was in the way
  • Big goals with no blueprint for reaching them
  • Ways of thinking that worked as a production manager but would not hold up in the plant manager seat
  • Work ran the schedule, and health, family, and everything else got whatever was left over
  • Nobody in his corner who had already made the jump and could show him the path
The work

What fifteen years with Aron looked like

This was not a course or a pep talk. It was a working relationship built around the job itself: the decisions, the people, the pressure, and the life outside the plant that has to hold it all up.

Aron gave Mike a concrete operating system for the plant manager seat: how to structure the week, where to put attention first, and how to lead the floor instead of chasing it. The same blueprint carried him through two different plants.

The thinking that gets someone to production manager is rarely the thinking that makes a great plant manager. Aron pushed on the assumptions Mike did not know he was carrying, and replaced reaction with deliberate leadership.

The plant manager role consumes people who let it. Aron worked with Mike on the habits that keep health, family, and faith in the schedule, because the leader who burns out at home eventually burns out on the floor too.

Aron Kolosik
Why it worked

A mentor who has been in the seat

Aron spent more than thirty years in manufacturing, from plant manager to VP of Operations to Chief Supply Chain Officer. When he challenged Mike's thinking, it landed differently, because it came from someone who had made the same decisions under the same pressure.

What got me here won't get me there. So what will?

That question, asked and answered over fifteen years, is the difference between a production manager with big goals and a plant manager leading his second plant.

❝
For 15+ years, Aron has provided guidance and direction to help me grow from an average Production Manager with big goals, to a highly successful Plant Manager at two different locations. I can't thank Aron enough for providing me a blueprint for success, that challenged previous ways of thinking, and provided me the means to get the appropriate “balance” needed to have success in the Plant Manager role. Without question, I wouldn't be where I am today professionally, or personally without his support and leadership.
Mike Anderson  ·  Plant Manager
The numbers

The results in plain terms

0+
Years of mentorship
A long-term working relationship, not a one-time program.
0
Plants led as plant manager
The same blueprint delivered results at two different locations.
0%
Reduction in unplanned downtime
Placeholder figure pending final numbers.

Mike started where you might be right now

If you are leading a plant, or working toward the seat, and there is no roadmap above you, that is the exact gap this work was built to close.

Book a Call
Take the Manufacturing Leadership Diagnostic →

Ready to talk about what this could look like for you?

Book a Call